Residential Electric Vehicle Charger Rebate Program
Eligible Customer Class(es): RESIDENTIAL
Description: To promote electrification and reduce net carbon emissions, RMLD offers a rebate to customers who purchase an electric vehicle (EV) charger that is installed at their residence within RMLD’s service territory.
Incentive Amount: Up to $750.00
Maximum Incentive: 100% of equipment costs (excluding tax).
Rebate Limitations: Limit two rebates per customer every five years.
Eligible Products/Equipment:
- Level 2 Network Enabled[1] Electric Vehicle Charging Station that is installed at the customer’s residence within RMLD’s service territory. Level 1 chargers are not eligible. Wiring and installation costs are not eligible.
Other Requirements:
- The Customer shall enroll in the RMLD’s Residential Time-of-Use Schedule A2 Rate for a minimum of one year.
- The customer shall provide, or authorize the EV charger manufacturer or their vehicle manufacturer to provide, RMLD with access to their charging data.
- The station must be installed by a licensed electrician.
- An RMLD Utility Authorization Number (UAN) is required.
- A Town Wiring Inspection is required post-installation (A Town Electrical Permit is a prerequisite to the wiring inspection).
- EXCEPTION: If the station is to be plugged into an existing 240-VAC outlet, then no wiring inspection is required for the rebate to be paid.
Process Steps:
- Pre-Installation:
- The contractor must call RMLD at 781-942-6598 to obtain a Utility Authorization Number (UAN).
- The contractor must obtain a Town Electrical Permit.
- Post-Installation:
- The contractor must ensure that the Town Wiring Inspection is completed.
How to Apply: Submit application and supporting documentation via RMLD’s Online Customer Rebate Portal.
Required Supporting Documentation:
- Proof of Purchase (must include description of item, purchase date, price paid, and purchased from)
- Equipment Specification Sheet
- Photo of the installed EV Charger
- Photo of serial number on the EV Charger
- Signed Customer Data Sharing and Time-of-Use Rate Agreement, which will be emailed for e-signature after the application is submitted
Application Deadline: Application and supporting documentation must be received within 180 days of final wiring inspection.
Payment Method: Rebate will be issued as a bill credit.
Noteworthy changes from previous version of program:
05.11.21 – Updated application deadline language from “submitted” to “received.”
02.12.21 – Exception regarding wiring inspection with existing 240-VAC outlet added under Other Requirements.
01.20.21 - Other Requirements and Process Steps updated to include pre-installation UAN and electrical permit requirements, and post-installation wiring inspection requirements.
07.01.19 - Changes to incentive amount and maximum incentive; addition of Customer Data Sharing and Time-of-Use requirements.
[1]Network Enabled – the charger has the capability to connect to the internet and transmit and receive information.
Effective Date: January 20, 2021